hbosch1946

By hbosch1946

West breakwater, Brighton Marina

Overcast with occasional showers.
The caissons were built on the foreshore, rolled on rails to the sea and then lowered. As each caisson was placed the rails were extended. An interesting but slow process to watch in the early 1970s.

Comments
Sign in or get an account to comment.