Since 28th July 2010 my journal has been documenting the construction of a wind farm in the Terra Alta region of Catalunya, Spain. We own and live in a Mas (finca) which is on the line of the wind turbines, and will have two of the beasts within 300 metres of our home.
~ 0 ~
Funny how you need a generator (or two) to enable the construction of an (aero)generador!
Very large and obviously well-used, here they are in front of one of the turbine blades.
- viewed 145 times :
- 9 comments :
- show tags








Comments
You must be signed in to comment on this journal. If you haven't already, why not start your own journal and be a part of the community? It's free, only takes a minute and you'll be able to comment on everyone's journals. Join now or sign in to get started.