Today’s job
Up just before six and out at half past before the streets were aired.
At the club by 7.30 where I ate my breakfast and a little after 8 we were working.
New cable pulled in under the pier decking and cleated securely. Service box installed on the railings and the other end terminated in the consumer unit. Complete and tidied away before the temperature got above 30 degrees.
Spent the afternoon inside watching Wimbledon.
Outside still over 25 at 1935…..
Comments
Sign in or get an account to comment.