Some heavy lifting going on at Erasmus Medical Center. The plan is to build a new faculty building that replaces the current white building. Interestingly the original building was conceived as a wet lab, but for now is also being used by the faculty.
The new building will be higher than the one it replaces which currently stands at 23 floors. Everyone is eagerly awaiting the new building as it means more room and more importantly more toilets per floor. For now its a challenge to find an unoccupied one :)
Dedicated to "powerplanter". An Amazing insight into the working of a power plant. Check it out.