Wait, see and hope

The coolingwaterhose from unit EC 6 to EC 20 was frozen....
So that would affect the availibility of the gasturbine of unit EC 20 (the so-called GTC), which we use in case of emergency.
So we had to start an extra coolingwaterpump of unit EC 6 for extra pressure and try to free it from ice.
One does that by means of dancing on the hose like Eddy does....
We had some success but that took a while, by opening a small ball valve we could check it out. A lot of "Slush Puppie" water came out and we had to dance on the hose when it stopped.
At last we had to loosen the couplings between the hoses to get rid of the ice.
Here Eddy is watching the Slush Puppie coming out....

Here in LARGE....

Comments
Sign in or get an account to comment.