Coz

By Corin

First fix plumbing

Stripped out the room today, was a bit of trouble with a soldered joint that was slightly wet.

Floor is primed and ready for levelling then grading to the drain.

Hopefully get the timber in for pan tomorrow.

Comments
Sign in or get an account to comment.