Barrier

The annual Thames Barrier test closure. 

The Barrier gates rotate by 90 degrees into the fully closed defence position stopping the tide going upstream into London. As the tide continues to come in, a higher level of water will build up downstream of the Barrier creating a different water level either side of the gates. Shortly after high tide, the gates will rotate further creating a 2 metre gap underneath (underspill). This in turn creates a white water rush effect behind each of the massive gate structures attracting birds to feed on small fish. This ‘underspill’ lasts approximately 2 hours.


September 2017

Comments
Sign in or get an account to comment.