Its taken me 2 days and not without challenges, but the shower room floor tiles are laid. Think I've got an adequate fall to the shower drain, and pretty level elsewhere in the room. Which wasn't easy as the existing levels of the concrete base were all over the place. Once again I used the Rubi levelling system to keep me on the straight and narrow. Next up, remove the wedges and then grouting.