GEO2B

By GEO2B

Burn bridge two

Being constructed over the top of the existing falling apart brick bridge.
The logic is that as in the downpour event ( a year last Feb.) the burn flowed over the top of the existing bridge if there is a next time it might flow underneath the new one.
Usefully at the moment the burn is dry so not necessary to be wearing waders for the job. After overnight welcome rain brightened and later a spot or two of not troublesome wet.
Friday night fish (sole) supper.

Comments
Sign in or get an account to comment.