Cumbrialass

By Cumbrialass

A mixture day. 
The B Gas  engineer was due between 10 am to 2

While we were waiting we cut back the hedge on the pavement side . It had dropped down quite a bit. That took an hour,  then we waited...and waited. I got a text at 12 pm to say the engineer was " on schedule "
At 1:25 I got a phone call to say the engineer was delayed and would come " sometime in the afternoon " I said theyd have to reschedule. 
Finally got out to take Robbie for his long overdue walk. 
We had a long walk along the top end of Channelside.  It was a lot warmer today but there was a bit of a breeze off the water. 
Ww then went to the tip to empty the huge bag full of the hedge clippings.  
A quick shop round Tesco then back home to mow the lawn 
Blip of Lavateria flowers on Channelside

Comments
Sign in or get an account to comment.