cate1

By cate1

Front driveway and drying area at the back of the

After the kerfuffle over the moving of the driveway boundary we decided to bite the bullet and install a new driveway and a new covering for the drying area. This was partly decided by how often the weeds grew up between the paving stones and it was difficult to keep them under control.  I think the original paving stones were laid in the late 60s or early 70s and several of the ones on the driveway were certainly needing replaced.  I think the work will take about 4 days to complete. 

Sadly we had to cut a Buddleia bush almost back to the ground so the work on the drying area could be done.  it's maybe a good thing as I read Buddleia should be kept quite low.  

Comments
Sign in or get an account to comment.