Front driveway and drying area at the back of the
After the kerfuffle over the moving of the driveway boundary we decided to bite the bullet and install a new driveway and a new covering for the drying area. This was partly decided by how often the weeds grew up between the paving stones and it was difficult to keep them under control. I think the original paving stones were laid in the late 60s or early 70s and several of the ones on the driveway were certainly needing replaced. I think the work will take about 4 days to complete.
Sadly we had to cut a Buddleia bush almost back to the ground so the work on the drying area could be done. it's maybe a good thing as I read Buddleia should be kept quite low.