Master Mariner

By MasterMariner

Peregrino Location

Arrived on location this morning and started with unloading food containers for the Hermod. After that assisted the tug Sea Leopard with unmooring the pile barge. As you can see on this pictures, all piles are stabbed subsea and you see that the next step is to drive the piles into the seafloor. The yellow cilinder is the hydraulic hammer actually, you can see the umbilical (to supply the hammer with power under water) clearly. It is quite a big jacket with eight legs. The waterdepth is around 110 meter over here. A last detail is the current; a sharp and trained eye can see that there is quite some current, check the whitecaps close to the stern of the Hermod.

Comments
Sign in or get an account to comment.