Master Mariner

By MasterMariner

Part I

Today and also what you see on this picture is where an awful lot of people were waiting for. Higher powers opened the swell window wide enough to allow us to moor the barge H-406 on the stern of the Hermod. Assisted by the capable tug Sea Leopard on the other side of the barge, it was a smooth operation, with movements of the barge much less than I personally expected. And that is good news. Preparations are underway full ahead to make the barge and module ready for lifting. That won't be before tomorrow morning, so in the meantiime we keep our fingers crossed for the next two important steps; the lifting of the module and the installation on top of the jacket. Keep you informed.

Comments
Sign in or get an account to comment.