Concrete

Concrete lorries queuing up to wait their turn at the site of AG24 (wind turbine number 24) so that their load can be dumped in the hole in the ground.

Wind turbines are not very green if the amount of concrete is taken into account...

Comments
Sign in or get an account to comment.