24th Nov 2013 brick work for the garage
-
22nd Nov 2013 ground level frame up
-
20th Nov 2013 Concrete poured and set
-
19th Nov 2013 pumping concrete into formword
-
17th Nov 2013 Slab form work with steel reinforcement
-
14th Nov 2013 Pumping water from the trenches
-
12th Nov 2013 Trenches ready for slab form work
-
11th Nov 2013 Issue with drainage pipe running along the footing
-
8th Nov 2013 sewer installation