RSD Photo's SoCal Life

By rsdphotography

Loading

Travel to the United States means plenty of time in the Zihuatanejo International Airport. We used to be able to see the planes from the gates, but this side of the terminal is undergoing significant construction and all the normal views are blocked by wood panels. We still, however, load from the ground through both doors, rows 1-20 go in the front door, rows 21-32 through the back (both steps visible in the background over the parade of travelers). Double door loading allows the crews to turn the flights around faster than what we are used to in the States. Six weeks away from Zihua, maybe all the construction projects will be completed by the time we return.

Comments
Sign in or get an account to comment.