Building Sn3 and N Worlds

By Stationmaster

Back to carpentey

Today I got back to carpentry and got three of the new legs installed. The two on the back wall now support off the wall and the left side of the swing door is also wall supported. Cut off the existing legs at each location and everything held level. Whew!!!!!!! All that is left is the two legs under the right side of the opening.

Tomorrow I will make two wooden beams that will span from the far right to the wall just to the left of the blip (about 11 feet) , and hold up the layout where the last two legs are. Once the carpet in out and the new stuff in, I will rebuild those two legs with adjustable feet. Then reinstall the swing door. The good news is that the adjustment feet will let me adjust both sides of the door frame to maintain the track levels. Been sort of a problem.

Comments
Sign in or get an account to comment.