Sometimes

By powerplanter

Plenty work

Unit nr 6 is undergoing a so-called "CI" (combustion inspection).
Everything related to the hot gas path is inspected and where necessary overhauled.
Although the gasvalves are not really related to the hot parts, they still have to be inspected, because failure of these valves can result in "tripping" of the unit (crash stop through failure).
These technicians are dismantling the hydraulic servo's for inspection.
This work is put out to a subcontractor, because we do not have enough specialists to do so much work in such a short time. (5 days)