The Passover

Renovation Of Thermal Element

Day 3

My step counter says I did 10008 steps today.
Three miles, on scaffolding. In the rain. 
Pretty pleased with that. 
My job was walking around the house, bringing tiles from the front to the back and stacking them in a way that allowed Gary to lay and fix them. 
Rob moved the piles of tiles up the sloping roof to further enable Gary to fix them with minimal movement. A sloping roof is a dangerous place. A sloping roof in the rain is slightly more challenging. 
But despite a day of rain the lads made great progress. At the back of the house two thirds of the roof is done. (extra) 
Gary feels we are ahead of schedule and is pleased with our team effort. 
If he is pleased, everyone is pleased. 

Things are looking up. 