John Van de Graaff

By VandeGraaff

House Construction 11

Today the builders started putting up the siding of our new home--by the end of the week the exterior should be essentially finished.

In the interior, the plumbing and electrical wiring are done, and the process of installing the insulation has just begun--I'll probably blip that in the next couple of days, since things are moving so fast.

The builders prepare some of the vinyl siding on the spot (which I had not realized)--using a long apparatus which creases it from flat strips. That's inside; here strips are being cut lengthwise to fit.

A link to the last previous construction blip is here, which has links leading further back.

Comments
Sign in or get an account to comment.